WVB East End Partners will commence roadway shoulder sweeping operations on the evening of August 10, 2017 starting at 7:00 pm. Operations will be conducted between MM 8.78 on Indiana SR 265 and MM 37.8 on Kentucky 841 in both directions of travel and on both sides of the roadway. Work will include the ramps at Exits 10 and 11 in Indiana. Work will conclude by 6:00 am on Friday August 15, 2017.
Personnel and equipment will be present on the inside and outside shoulders of the roadway and therefore, motorists are asked to use caution in the area during the sweeping period.
via East End Crossing http://ift.tt/2vevJmn
No comments:
Post a Comment