Monday, October 9, 2017

October 12, 2017 Monthly Shoulder Sweeping Operations

WVB East End Partners will commence roadway shoulder sweeping operations on the evening of October 12, 2017 starting at 7:00 pm. Operations will be conducted between MM 8.78 on Indiana SR 265 and MM 37.8 on Kentucky 841 in both directions of travel and on both sides of the roadway. Work will include the ramps at Exits 10 and 11 in Indiana. Work will conclude by 6:00 am on Friday October 13, 2017.

 

Personnel and equipment will be present on the inside and outside shoulders of the roadway and therefore, motorists are asked to use caution in the area during the sweeping period.



via East End Crossing http://ift.tt/2xthdf1

Louisville Weather Forecast; October 09, 2017 at 05:00AM

Morning Weather Forecast: Cloudy with a temp of 69F.

Todays forecast calls for 81F and a low of 64F.

UV Index: 0

Humdity: 97

Pollen Count: 1

img src="http://ift.tt/1hh3vdj">