Monday, March 5, 2018

March 8, 2018 Monthly Sweeping of Lewis and Clark Bridge

 

On Thursday March 8, 2018 from 7:00 pm to 6:00 am on Friday, WVB East End Partners will perform roadway shoulder sweeping operations. Operations will be conducted between MM 8.78 on Indiana SR 265 and MM 37.8 on Kentucky 841 in both directions of travel and on both sides of the roadway. Work will include the ramps at Exits 10 and 11 in Indiana. Work will conclude by 6:00 am on Friday. Prep work for this sweeping will be performed on Thursday March 8, 2018 and crews and equipment will be present on the roadway from 11:00 am to 3:00 pm.

 

 

 

Personnel and equipment will be present on the inside and outside shoulders of the roadway and therefore, motorists are asked to use caution in the area during the work activities.

 



via East End Crossing http://ift.tt/2FTyQW1

Louisville Weather Forecast; March 05, 2018 at 05:00AM

Morning Weather Forecast: Fair with a temp of 37F.

Todays forecast calls for 54F and a low of 39F.

UV Index: 0

Humdity: 53

Pollen Count: 3

img src="http://ift.tt/2DqXVK0