Nov. 25, 2015 – In addition to previously announced closures, two Downtown Louisville ramps will be closed Sunday in connection with construction on the Downtown Crossing: Closures scheduled Sunday, November 29 • Ramp from I-65 South to I-71 North • Ramp from I-65 North to I-71 North Both ramps are scheduled to close around 7 […]
via Ohio Bridges http://ift.tt/1N8gafN http://ift.tt/eA8V8J
Wednesday, November 25, 2015
Downtown Crossing: Look Ahead (Additions)
Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, Downtown Crossing: Look Ahead (Additions) www.kyinbridges.com
http://ift.tt/19fNRe4 November 25, 2015 at 02:30PM
http://ift.tt/19fNRe4 November 25, 2015 at 02:30PM
East End Crossing: Blasting and Traffic Update for Week of November 30
Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, East End Crossing: Blasting and Traffic Update for Week of November 30 www.kyinbridges.com
http://ift.tt/19fNRe4 November 25, 2015 at 11:45AM
http://ift.tt/19fNRe4 November 25, 2015 at 11:45AM
Kentucky: Blasting schedule for week of November 30, 2015
November 24, 2015 – Surface blasting is scheduled to occur near the intersection of U.S. 42 and KY 841 during the week of November 30, 2015. Prior to each blast, traffic must be stopped for five to twenty minutes for the safety of the workers and the traveling public. Traffic will be stopped on KY […]
via East End Crossing http://ift.tt/1kTzWpj http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1kTzWpj http://ift.tt/eA8V8J
Indiana: Lane restrictions on SR 62 November 30 – December 4, 2015
November 24, 2015 – There will be lane restrictions on SR 62 and its corresponding ramps in the vicinity of the SR 265/ SR 62/ Port Road interchange November 30 – December 4, 2015 from 8 a.m.– 5 p.m. each day. The lane restrictions will be in place for about a half mile in each […]
via East End Crossing http://ift.tt/1XqWZUg http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1XqWZUg http://ift.tt/eA8V8J
Indiana: Lane restrictions on Upper River Road November 30 – December 4, 2015
November 24, 2015 – There will be lane restrictions in Indiana on Upper River Road in the vicinity of the East End Crossing construction site November 30 – December 4, 2015 from 8 a.m.– 5 p.m. each day. Flaggers will be present during this time to assist in guiding traffic. Motorists are asked to use […]
via East End Crossing http://ift.tt/1XqX0HL http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1XqX0HL http://ift.tt/eA8V8J
Louisville Weather Forecast; November 25, 2015 at 05:00AM
Morning Weather Forecast: Fair with a temp of 39F.
Todays forecast calls for 62F and a low of 45F.
UV Index: 0
Humdity: 76
Pollen Count: .10
img src="http://ift.tt/1hh3vdj">
Todays forecast calls for 62F and a low of 45F.
UV Index: 0
Humdity: 76
Pollen Count: .10
img src="http://ift.tt/1hh3vdj">
Subscribe to:
Posts (Atom)