Thursday, July 28, 2016

Kentucky: KY 841 to I-71 S ramp to close overnight July 29

July 28, 2016 — Due to paving work, the KY 841 southbound ramp to I-71 S will be closed one night starting at 9:00 p.m. Friday, July 29, 2016 until 6 a.m. Saturday, July 30. Signed detours will be in place during the full closure.



via East End Crossing http://ift.tt/2ahGUlh

Kentucky: KY 841 lanes to shift to new configuration by August 3

July 28, 2016 — The northbound and southbound lanes of KY 841 will shift from their current location to the newly paved traffic lanes. The shift is expected to be completed by August 3. Access to U.S. 42 and I-71 will be maintained. Motorists are encouraged to use caution while driving in the construction area.



via East End Crossing http://ift.tt/2agLPzU

Kentucky: Periodic closures on Transylvania Beach Road Aug 1-6, 2016

July 28, 2016 – Due to overhead bridge work, there will be periodic 20-minute closures on Transylvania Beach Road August 1-6 from 7 a.m. – 5 p.m. each day. Motorists are asked to use caution and drive slowly when driving in the area.



via East End Crossing http://ift.tt/2ahHa3C

Indiana: Lane restrictions on Upper River Road Aug 1- 6, 2016

July 28, 2016 – There will be lane restrictions in Indiana on Upper River Road in the vicinity of the East End Crossing construction site August 1-6 from 8 a.m.–5 p.m. each day. Flaggers will be present during this time to assist in guiding traffic. Motorists are asked to use caution when in the area.



via East End Crossing http://ift.tt/2agLfSI

Indiana: Lane restrictions on SR 62 Aug 1-6, 2016

July 28, 2016 There will be lane restrictions on SR 62 in Indiana in the vicinity of the SR 265 and SR 62 interchange August  1-6 from 8 a.m. – 5 p.m. each day. The lane restrictions will be in place for about a half mile in each direction of the interchange. Motorists are asked to use caution and drive slowly when driving in the area during this time.



via East End Crossing http://ift.tt/2ahGWd7

East End Crossing Traffic Outlook July 28


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, East End Crossing Traffic Outlook July 28 www.kyinbridges.com

http://ift.tt/19fNRe4 July 28, 2016 at 03:22PM

On Schedule: A Progress Report On The Kennedy Bridge

New video and photos detail work underway July 28, 2016 – Major improvements to the John F. Kennedy Memorial Bridge are on schedule, with the bridge scheduled to reopen to traffic this fall. A new floor system is being installed as part of the work on the Downtown Crossing portion of the Louisville – Southern […]

via Traffic Updates | Ohio Bridges http://ift.tt/2apYRzq

On Schedule: A Progress Report On The Kennedy Bridge


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, On Schedule: A Progress Report On The Kennedy Bridge www.kyinbridges.com

http://ift.tt/19fNRe4 July 28, 2016 at 08:57AM

Louisville Weather Forecast; July 28, 2016 at 05:00AM

Morning Weather Forecast: Thunderstorms with a temp of 77F.

Todays forecast calls for 78F and a low of 74F.

UV Index: 0

Humdity: 88

Pollen Count: 4.00

img src="http://ift.tt/1hh3vdj">