WVB will be closing the Shared Use Path on the Lewis and Clark Bridge from 8AM to 5PM on 8/14/2017 through 8/18/2017. The crews will be performing the annual cleaning of the Lewis and Clark Bridge on the downstream side.
via East End Crossing http://ift.tt/2wLZieu
No comments:
Post a Comment