Friday, September 25, 2015

Louisville Traffic Update, Construction / Road Work. All Lanes Blocked. : Watch for alternating lane closures overnight on I-64 East in the Downtown construction area on Saturday, 9/26/15. The right and left lanes will close at different times. Lane closures will begin at 9:00 PM and lanes will reopen by 5:00 AM.


54582 : I-64 East between MM 4.4 and 6.3 Between 3rd Street and Story Avenue Construction / Road Work. All Lanes Blocked. : Watch for alternating lane closures overnight on I-64 East in the Downtown construction area on Saturday, 9/26/15. The right and left lanes will close at different times. Lane closures will begin at 9:00 PM and lanes will reopen by 5:00 AM. September 25, 2015 at 05:16PM TRIMARC Incident and Construction Feed

No comments:

Post a Comment