Sept. 25, 2014 – Blasting to prepare for the East End Crossing is scheduled to occur in Indiana during the week of September 29, 2014. Blasting will occur between Port Road and Upper River Road. These blasts do NOT require traffic stops. The dates and approximate times will be: Monday, September 29: Several blasts in […]
via East End Crossing http://ift.tt/1DzEE0i http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1DzEE0i http://ift.tt/eA8V8J
No comments:
Post a Comment