Morning Weather Forecast: Fair with a temp of 35F.
Todays forecast calls for 54F and a low of 30F.
UV Index: 7.30
Humdity: 76
Pollen Count: 7.30
img src="http://ift.tt/1hh3vdj">
Friday, April 8, 2016
Thursday, April 7, 2016
East End Crossing: Blasting schedule for week of April 11
Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, East End Crossing: Blasting schedule for week of April 11 www.kyinbridges.com
http://ift.tt/19fNRe4 April 07, 2016 at 04:13PM
http://ift.tt/19fNRe4 April 07, 2016 at 04:13PM
Kentucky: Blasting schedule for week of April 11, 2016
April 7, 2016 – Site blasting is scheduled to occur near the tunnel’s north portal, located just south of River Road, during the week of April 11. These blasts do NOT require traffic stops. The dates and approximate times (within 20 minutes) will be: Monday, April 11, at about 12 p.m. noon and again at […]
via East End Crossing http://ift.tt/1S08iCH http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1S08iCH http://ift.tt/eA8V8J
Kentucky: Periodic closures on Transylvania Beach Road April 11-15, 2016
April 7, 2016 – Due to overhead bridge work, there will be periodic 20-minute closures on Transylvania Beach Road April 11-15 from 7 a.m. – 5 p.m. each day. Motorists are asked to use caution and drive slowly when driving in the area during this time. In the event of unfavorable weather or other unforeseen […]
via East End Crossing http://ift.tt/1S5IhF9 http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1S5IhF9 http://ift.tt/eA8V8J
Indiana: Lane restrictions on SR 62 April 11-16, 2016
April 7, 2016 – There will be lane restrictions on SR 62 and its corresponding ramps in the vicinity of the SR 265/ SR 62/ Port Road interchange April 11-16 from 8 a.m.– 5 p.m. each day. The lane restrictions will be in place for about a half mile in each direction of the interchange. […]
via East End Crossing http://ift.tt/1S08iCE http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1S08iCE http://ift.tt/eA8V8J
Subscribe to:
Posts (Atom)