Morning Weather Forecast: Cloudy with a temp of 43F.
Todays forecast calls for 55F and a low of 37F.
UV Index: Not Available
Humdity: 76
Pollen Count: Not Available
img src="http://ift.tt/1hh3vdj">
Friday, March 25, 2016
Thursday, March 24, 2016
Kentucky: Blasting schedule for week of March 28, 2016
March 24, 2016 – Site blasting is scheduled to occur near the tunnel’s north portal, located just south of River Road, during the week of March 28. These blasts do NOT require traffic stops. The dates and approximate times (within 20 minutes) will be: Monday, March 28, at about 12 p.m. noon and again at […]
via East End Crossing http://ift.tt/1RourId http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1RourId http://ift.tt/eA8V8J
Kentucky: Periodic closures on Transylvania Beach Road March 28- April 1, 2016
March 24, 2016 – Due to overhead bridge work, there will be periodic 20-minute closures on Transylvania Beach Road March 28 – April 1 from 7 a.m. – 5 p.m. each day. Motorists are asked to use caution and drive slowly when driving in the area during this time. In the event of unfavorable weather […]
via East End Crossing http://ift.tt/1RC0Bpf http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1RC0Bpf http://ift.tt/eA8V8J
Kentucky: Blasting schedule for week of March 28.
Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, Kentucky: Blasting schedule for week of March 28. www.kyinbridges.com
http://ift.tt/19fNRe4 March 24, 2016 at 02:51PM
http://ift.tt/19fNRe4 March 24, 2016 at 02:51PM
Indiana: Lane restrictions on SR 62 March 28 – April 2, 2016
March 24, 2016 – There will be lane restrictions on SR 62 and its corresponding ramps in the vicinity of the SR 265/ SR 62/ Port Road interchange March 28 – April 2 from 8 a.m.– 5 p.m. each day. The lane restrictions will be in place for about a half mile in each direction […]
via East End Crossing http://ift.tt/1RoA5fJ http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1RoA5fJ http://ift.tt/eA8V8J
Subscribe to:
Posts (Atom)