Sunday, September 20, 2015

Louisville Weather Forecast; September 20, 2015 at 05:00AM

Morning Weather Forecast: Fair with a temp of 63F.

Todays forecast calls for 78F and a low of 53F.

UV Index: 0

Humdity: 70

Pollen Count: 6.70

img src="http://ift.tt/1hh3vdj">

Saturday, September 19, 2015

Louisville Weather Forecast; September 19, 2015 at 05:00AM

Morning Weather Forecast: Fair with a temp of 70F.

Todays forecast calls for 80F and a low of 56F.

UV Index: 0

Humdity: 73

Pollen Count: 8.10

img src="http://ift.tt/1hh3vdj">

Friday, September 18, 2015

REMINDER: Lane restrictions on SR 62 September 18-26, 2015

Sept. 18, 2015 – There will be lane restrictions on SR 62 in Indiana in the vicinity of the SR 265 and SR 62 interchange September 18-26, 2015 from 8 a.m.–5 p.m. each day. The lane restrictions will be in place for about a half mile in each direction of the interchange. Motorists are asked […]

via East End Crossing http://ift.tt/1MwM8b0 http://ift.tt/eA8V8J

Louisville Traffic Update, Construction / Road Work. Left Lane and Right Lane Blocked. : The Kentucky Transportation Cabinet (KYTC) District 5 Office advises motorists of upcoming lane closures on Interstate 64 near the Ohio River in Jefferson County. KYTC engineers will be performing the biennial inspection of the I-64 bridges between I-264 (Georgia Powers Expressway) and the Sherman Minton Bridge (mile points 0.0 to 0.8). Inspection work is scheduled to begin on Sunday evening, September 20. Lane closures are possible in both directions on I-64 Sunday – Thursday from 8:00 p.m. each evening until 5:00 a.m. the following morning. Shoulder closures are possible during daytime hours for inspection via bucket truck access. These inspections should be completed by September 30.


54497 : I-64 West at MM 0.8 On Sherman Minton Bridge and bridge approach Construction / Road Work. Left Lane and Right Lane Blocked. : The Kentucky Transportation Cabinet (KYTC) District 5 Office advises motorists of upcoming lane closures on Interstate 64 near the Ohio River in Jefferson County. KYTC engineers will be performing the biennial inspection of the I-64 bridges between I-264 (Georgia Powers Expressway) and the Sherman Minton Bridge (mile points 0.0 to 0.8). Inspection work is scheduled to begin on Sunday evening, September 20. Lane closures are possible in both directions on I-64 Sunday – Thursday from 8:00 p.m. each evening until 5:00 a.m. the following morning. Shoulder closures are possible during daytime hours for inspection via bucket truck access. These inspections should be completed by September 30. September 18, 2015 at 06:23PM TRIMARC Incident and Construction Feed

Look Ahead: Sept. 18 – 26

Sept. 18, 2015 – The following closures and lane restrictions are expected the rest of this week and next week in connection with construction on the Downtown Crossing: Overnight closures scheduled Friday, September 18 and Saturday, September 19* Ramp from I-64 East to I-65 North Ramp from I-65 South to I-64 East/I-71 North Ramp from I-65 […]

via Ohio Bridges http://ift.tt/1LnkJqi http://ift.tt/eA8V8J