Morning Weather Forecast: Clear with a temp of 56F.
Todays forecast calls for 78F and a low of 56F.
UV Index: 0
Humdity: 68
Pollen Count: 8.50
img src="http://ift.tt/1hh3vdj">
Saturday, May 7, 2016
Friday, May 6, 2016
Downtown Crossing: Look Ahead May 6-14
May 6, 2016 – The following closures and lane restrictions are expected next week in connection with construction on the Downtown Crossing. No overnight closures are scheduled for Friday, May 6 and Saturday, May 7 (Oaks and Derby). Work Scheduled for Next Week Overnight closures scheduled Monday, May 9-Saturday, May 14* Ramp from I-64 East […]
via Ohio Bridges http://ift.tt/1XcVZGP
via Ohio Bridges http://ift.tt/1XcVZGP
Downtown Crossing: Look Ahead May 6-14
Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, Downtown Crossing: Look Ahead May 6-14 www.kyinbridges.com
http://ift.tt/19fNRe4 May 06, 2016 at 02:02PM
http://ift.tt/19fNRe4 May 06, 2016 at 02:02PM
Louisville Weather Forecast; May 06, 2016 at 05:00AM
Morning Weather Forecast: Clear with a temp of 53F.
Todays forecast calls for 69F and a low of 49F.
UV Index: 0
Humdity: 72
Pollen Count: 6.20
img src="http://ift.tt/1hh3vdj">
Todays forecast calls for 69F and a low of 49F.
UV Index: 0
Humdity: 72
Pollen Count: 6.20
img src="http://ift.tt/1hh3vdj">
Thursday, May 5, 2016
Kentucky: Blasting schedule for week of May 9, 2016
May 5, 2016 – Site blasting is scheduled to occur near the tunnel’s north portal, located just south of River Road, during the week of May 9. These blasts do NOT require traffic stops.
The dates and approximate times (within 20 minutes) will be:
- Monday, May 9, at about 12 p.m. noon and again at about 4 p.m.
- Tuesday, May 10, at about 12 p.m. noon and again at about 4 p.m.
- Wednesday, May 11, at about 12 p.m. noon and again at about 4 p.m.
- Thursday, May 12, at about 12 p.m. noon and again at about 4 p.m.
- Friday, May 13, at about 12 p.m. noon and again at about 4 p.m.
NOTE: A message will be posted on the project website at www.kyinbridges.com Thursday of each week regarding the anticipated blasting schedule for the following week.
In the event of unfavorable weather or other unforeseen activities, this schedules may change. When changes do occur, they will be posted on www.kyinbridges.com, on Twitter @eastendcrossing and on Facebook at http://ift.tt/1cA8FvY.
via East End Crossing http://ift.tt/1Wcnhhp
Subscribe to:
Posts (Atom)