Thursday, April 21, 2016

Clearing The Way For Thunder

No work and no new closures Saturday April 21, 2016 – With hundreds of thousands of people expected in Downtown Louisville and Southern Indiana on Saturday for Thunder Over Louisville, the Kentucky Transportation Cabinet and Walsh Construction want to make the trip as easy as possible for the large crowds. The air show and fireworks […]

via Ohio Bridges http://ift.tt/1HbHaM8 http://ift.tt/eA8V8J

East End Crossing: Blasting schedule for week of April 25 2016


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, East End Crossing: Blasting schedule for week of April 25, 2016 www.kyinbridges.com http://ift.tt/19fNRe4 April 21, 2016 at 03:38PM

Kentucky: Blasting schedule for week of April 15 2016

April 21, 2016 – Site blasting is scheduled to occur near the tunnel’s north portal, located just south of River Road, during the week of April 25. These blasts do NOT require traffic stops. The dates and approximate times (within 20 minutes) will be: Monday, April 25, at about 12 p.m. noon and again at […]

via East End Crossing http://ift.tt/1Qqmbpq http://ift.tt/eA8V8J

Kentucky: Periodic closures on Transylvania Beach Road April 25-29 2016

April 21, 2016 – Due to overhead bridge work, there will be periodic 20-minute closures on Transylvania Beach Road April 25-29 from 7 a.m. – 5 p.m. each day. Motorists are asked to use caution and drive slowly when driving in the area during this time. In the event of unfavorable weather or other unforeseen […]

via East End Crossing http://ift.tt/1SedxA0 http://ift.tt/eA8V8J

Indiana: Lane restrictions on SR 62 April 25-30 2016

April 21, 2016 – There will be lane restrictions on SR 62 and its corresponding ramps in the vicinity of the SR 265/ SR 62/ Port Road interchange April 25-30 from 8 a.m.– 5 p.m. each day. The lane restrictions will be in place for about a half mile in each direction of the interchange. […]

via East End Crossing http://ift.tt/1Qqm9ho http://ift.tt/eA8V8J