Friday, April 8, 2016

Downtown Crossing: Look Ahead Through April 16

LOUISVILLE, Ky. (Apr. 8, 2016) – The following closures and lane restrictions are expected the rest of this week and next week in connection with construction on the Downtown Crossing. Overnight closures scheduled Friday, April 8 and Saturday, April 9* • Ramp from I-64 East to I-71 North • Ramp from I-64 East to I-65 […]

via Ohio Bridges http://ift.tt/1UOmMZP http://ift.tt/eA8V8J

Downtown Crossing: Look Ahead Through April 16


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, Downtown Crossing: Look Ahead Through April 16 www.kyinbridges.com

http://ift.tt/19fNRe4 April 08, 2016 at 04:25PM

Louisville Weather Forecast; April 08, 2016 at 05:00AM

Morning Weather Forecast: Fair with a temp of 35F.

Todays forecast calls for 54F and a low of 30F.

UV Index: 7.30

Humdity: 76

Pollen Count: 7.30

img src="http://ift.tt/1hh3vdj">

Thursday, April 7, 2016

East End Crossing: Blasting schedule for week of April 11


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, East End Crossing: Blasting schedule for week of April 11 www.kyinbridges.com

http://ift.tt/19fNRe4 April 07, 2016 at 04:13PM

Kentucky: Blasting schedule for week of April 11, 2016

April 7, 2016 – Site blasting is scheduled to occur near the tunnel’s north portal, located just south of River Road, during the week of April 11. These blasts do NOT require traffic stops. The dates and approximate times (within 20 minutes) will be: Monday, April 11, at about 12 p.m. noon and again at […]

via East End Crossing http://ift.tt/1S08iCH http://ift.tt/eA8V8J