Friday, October 16, 2015

Louisville Traffic Update, Accident. Left Shoulder and Left Lane Blocked. : Maybe seen on camera 71.


54811 : I-71 South at MM 2 Approaching I-265 Accident. Left Shoulder and Left Lane Blocked. : Maybe seen on camera 71. October 16, 2015 at 06:46PM TRIMARC Incident and Construction Feed

Louisville Traffic Update, Accident. Right Shoulder Blocked. : May be viewed on TRIMARC camera 74


54810 : I-264 East at MM 17.3 Accident. Right Shoulder Blocked. : May be viewed on TRIMARC camera 74 October 16, 2015 at 05:50PM TRIMARC Incident and Construction Feed

Louisville Traffic Update, Disabled Vehicle-Occupied. Left Shoulder Blocked. :


54808 : I-64 East at MM 4.6 Area of Yum Center Disabled Vehicle-Occupied. Left Shoulder Blocked. : October 16, 2015 at 05:24PM TRIMARC Incident and Construction Feed

Louisville Traffic Update, Disabled Vehicle-Occupied. :


54809 : I-264 West at MM 15.7 Disabled Vehicle-Occupied. : October 16, 2015 at 05:26PM TRIMARC Incident and Construction Feed

Louisville Traffic Update, Construction / Road Work. All Lanes Blocked. : Downtown Ramps to Close SaturdayInterstate ramps from I-65 to I-71 will close for concrete pourThe ramps from I-65 North and I-65 South to I-71 North are scheduled to close Saturday, Oct. 17. The ramps will close around 7 a.m., when construction crews begin pouring concrete for a new bridge deck in the Downtown Crossing portion of the Ohio River Bridges Project.The ramps are scheduled to reopen by 5 a.m. Sunday, Oct. 18. A signed detour will be in place to direct drivers.Navigate traffic with KYTC, www.511.ky.gov, and Waze, www.waze.com.


54805 : I-65 North at MM 136.2 Ramp to I-71 North Construction / Road Work. All Lanes Blocked. : Downtown Ramps to Close SaturdayInterstate ramps from I-65 to I-71 will close for concrete pourThe ramps from I-65 North and I-65 South to I-71 North are scheduled to close Saturday, Oct. 17. The ramps will close around 7 a.m., when construction crews begin pouring concrete for a new bridge deck in the Downtown Crossing portion of the Ohio River Bridges Project.The ramps are scheduled to reopen by 5 a.m. Sunday, Oct. 18. A signed detour will be in place to direct drivers.Navigate traffic with KYTC, www.511.ky.gov, and Waze, www.waze.com. October 16, 2015 at 05:01PM TRIMARC Incident and Construction Feed