WVC will close the right lane eastbound through the tunnel on Thursday morning at 8:00 am for pavement repairs. The lane will reopen at 5:00 am on Friday January 12, 2018.
via East End Crossing http://ift.tt/2DdGSrI
WVC will close the right lane eastbound through the tunnel on Thursday morning at 8:00 am for pavement repairs. The lane will reopen at 5:00 am on Friday January 12, 2018.
WVB East End Partners will commence roadway shoulder sweeping operations on the evening of January 11, 2018 starting at 7:00 pm. Operations will be conducted between MM 8.78 on Indiana SR 265 and MM 37.8 on Kentucky 841 in both directions of travel and on both sides of the roadway. Work will conclude by 6:00 am on Friday January 12, 2018.
Personnel and equipment will be present on the inside and outside shoulders of the roadway and therefore, motorists are asked to use caution in the area during the sweeping period.