Friday, May 13, 2016

Downtown Crossing:  Construction Leads to Traffic Shift on I-64 East


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, Downtown Crossing: Construction Leads to Traffic Shift on I-64 East www.kyinbridges.com

http://ift.tt/19fNRe4 May 13, 2016 at 03:17PM

Downtown Crossing:  Look Ahead Through May 21


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, Downtown Crossing: Look Ahead Through May 21 www.kyinbridges.com

http://ift.tt/19fNRe4 May 13, 2016 at 03:32PM

Louisville Weather Forecast; May 13, 2016 at 05:00AM

Morning Weather Forecast: Clear with a temp of 61F.

Todays forecast calls for 70F and a low of 55F.

UV Index: 0

Humdity: 81

Pollen Count: 6.90

img src="http://ift.tt/1hh3vdj">

Thursday, May 12, 2016

East End Crossing: KY 841 Southbound traffic shift rescheduled to occur May 14.


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, East End Crossing: KY 841 Southbound traffic shift rescheduled to occur May 14. www.kyinbridges.com

http://ift.tt/19fNRe4 May 12, 2016 at 05:26PM

Kentucky: KY 841 Southbound traffic shifting to new roadway May 13, 2016

May 12, 2016 – The Southbound lane of KY 841, just south of the temporary traffic signal, will be shifted to the left by one lane. Traffic is expected to shift to its new position by 5 a.m. on Friday, May 13. All ramps from KY 841 to the I-71 interchange will remain open and unaffected.

In the event of unfavorable weather or other unforeseen activities, this schedule may change. When changes do occur, they will be posted on www.kyinbridges.com, on Twitter @eastendcrossing and at http://ift.tt/1cA8FvY.



via East End Crossing http://ift.tt/1T7RZ8G