Thursday, April 7, 2016

East End Crossing: Blasting schedule for week of April 11


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, East End Crossing: Blasting schedule for week of April 11 www.kyinbridges.com

http://ift.tt/19fNRe4 April 07, 2016 at 04:13PM

Kentucky: Blasting schedule for week of April 11, 2016

April 7, 2016 – Site blasting is scheduled to occur near the tunnel’s north portal, located just south of River Road, during the week of April 11. These blasts do NOT require traffic stops. The dates and approximate times (within 20 minutes) will be: Monday, April 11, at about 12 p.m. noon and again at […]

via East End Crossing http://ift.tt/1S08iCH http://ift.tt/eA8V8J

Kentucky: Periodic closures on Transylvania Beach Road April 11-15, 2016

April 7, 2016 – Due to overhead bridge work, there will be periodic 20-minute closures on Transylvania Beach Road April 11-15 from 7 a.m. – 5 p.m. each day. Motorists are asked to use caution and drive slowly when driving in the area during this time. In the event of unfavorable weather or other unforeseen […]

via East End Crossing http://ift.tt/1S5IhF9 http://ift.tt/eA8V8J

Indiana: Lane restrictions on SR 62 April 11-16, 2016

April 7, 2016 – There will be lane restrictions on SR 62 and its corresponding ramps in the vicinity of the SR 265/ SR 62/ Port Road interchange April 11-16 from 8 a.m.– 5 p.m. each day. The lane restrictions will be in place for about a half mile in each direction of the interchange. […]

via East End Crossing http://ift.tt/1S08iCE http://ift.tt/eA8V8J

Indiana: Lane restrictions on Upper River Road April 11-16, 2016

April 7, 2016 – There will be lane restrictions on Upper River Road in the vicinity of the East End Crossing construction site April 11-16 from 8 a.m.– 5 p.m. each day. Flaggers will be present during this time to assist in guiding traffic. Motorists are asked to use caution and drive slowly when driving […]

via East End Crossing http://ift.tt/1S5IhoO http://ift.tt/eA8V8J