Thursday, March 17, 2016

East End Crossing: Blasting Schedule For Week Of March 21


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, East End Crossing: Blasting Schedule For Week Of March 21 www.kyinbridges.com

http://ift.tt/19fNRe4 March 17, 2016 at 04:49PM

Kentucky: Blasting schedule for week of March 21, 2016

March 17, 2016 – Site blasting is scheduled to occur near the tunnel’s north portal, located just south of River Road, during the week of March 21, 2016. These blasts do NOT require traffic stops. The dates and approximate times (within 20 minutes) will be: Monday, March 21, at about 12 p.m. noon and again […]

via East End Crossing http://ift.tt/1RRiwlQ http://ift.tt/eA8V8J

Kentucky: Periodic closures on Transylvania Beach Road March 21-25, 2016

March 17, 2016 –Due to overhead bridge work, there will be periodic 20-minute closures on Transylvania Beach Road March 21-25, 2016 from 7 a.m. – 5 p.m. each day. Motorists are asked to use caution and drive slowly when driving in the area during this time. In the event of unfavorable weather or other unforeseen […]

via East End Crossing http://ift.tt/1UDx1yw http://ift.tt/eA8V8J

Indiana: Lane restrictions on Upper River Road March 21-26, 2016

March 17, 2016 – There will be lane restrictions on Upper River Road in the vicinity of the East End Crossing construction site March 21-26, 2016 from 8 a.m.– 5 p.m. each day. Flaggers will be present during this time to assist in guiding traffic. Motorists are asked to use caution and drive slowly when […]

via East End Crossing http://ift.tt/1RRiw5r http://ift.tt/eA8V8J

Indiana: Lane restrictions on SR 62 March 21-26, 2016

March 17, 2016 – There will be lane restrictions on SR 62 and its corresponding ramps in the vicinity of the SR 265/ SR 62/ Port Road interchange March 21-26, 2016 from 8 a.m.– 5 p.m. each day. The lane restrictions will be in place for about a half mile in each direction of the […]

via East End Crossing http://ift.tt/1UDx1i9 http://ift.tt/eA8V8J