March 10, 2016 – Site blasting is scheduled to occur near the tunnel’s north portal, located just south of River Road, during the week of March 14, 2016. These blasts do NOT require traffic stops. The dates and approximate times (within 20 minutes) will be: Monday, March 14, at about 12 p.m. noon and again […]
via East End Crossing http://ift.tt/1LULp3U http://ift.tt/eA8V8J
March 10, 2016 – There will be lane restrictions on SR 62 and its corresponding ramps in the vicinity of the SR 265/ SR 62/ Port Road interchange March 14-19, 2016 from 8 a.m.– 5 p.m. each day. The lane restrictions will be in place for about a half mile in each direction of the […]
via East End Crossing http://ift.tt/1XfPoIU http://ift.tt/eA8V8J
March 10, 2016 – There will be lane restrictions on Upper River Road in the vicinity of the East End Crossing construction site March 14-19, 2016 from 8 a.m.– 5 p.m. each day. Flaggers will be present during this time to assist in guiding traffic. Motorists are asked to use caution and drive slowly when […]
via East End Crossing http://ift.tt/1LULoNj http://ift.tt/eA8V8J