Thursday, February 4, 2016

East End Crossing: Blasting schedule for week of February 8, 2016


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, East End Crossing: Blasting schedule for week of February 8, 2016 www.kyinbridges.com

http://ift.tt/19fNRe4 February 04, 2016 at 02:54PM

Kentucky: Blasting schedule for week of February 8, 2016

Feb. 4, 2016 – Surface blasting is scheduled to occur near the intersection of U.S. 42 and KY 841 during the week of February 8, 2016. Prior to each blast, traffic must be stopped for five to twenty minutes for the safety of the workers and the traveling public. Traffic will be stopped on KY […]

via East End Crossing http://ift.tt/1NSDZIt http://ift.tt/eA8V8J

Kentucky: Periodic closures on Transylvania Beach Road Feb. 8-12, 2016

Feb. 4, 2016 – Due to overhead bridge work, there will be periodic 20-minute closures on Transylvania Beach Road Feb. 8-12, 2016 from 7 a.m. – 5 p.m. each day. Motorists are asked to use caution and drive slowly when driving in the area during this time. In the event of unfavorable weather or other […]

via East End Crossing http://ift.tt/1NSE13i http://ift.tt/eA8V8J

Indiana: Lane restrictions on SR 62 Feb. 8-13, 2016

Feb. 4, 2016 – There will be lane restrictions on SR 62 and its corresponding ramps in the vicinity of the SR 265/ SR 62/ Port Road interchange Feb. 8-13, 2016 from 8 a.m.– 5 p.m. each day. The lane restrictions will be in place for about a half mile in each direction of the […]

via East End Crossing http://ift.tt/23LB0xc http://ift.tt/eA8V8J

Indiana: Lane restrictions on Upper River Road Feb. 8-13, 2016

Feb. 4, 2016 – There will be lane restrictions on Upper River Road in the vicinity of the East End Crossing construction site Feb. 8-13, 2016 from 8 a.m.– 5 p.m. each day. Flaggers will be present during this time to assist in guiding traffic. Motorists are asked to use caution and drive slowly when […]

via East End Crossing http://ift.tt/23LAYWn http://ift.tt/eA8V8J