Morning Weather Forecast: Fair with a temp of 29F.
Todays forecast calls for 51F and a low of 29F.
UV Index: 0
Humdity: 90
Pollen Count: .10
img src="http://ift.tt/1hh3vdj">
Friday, December 4, 2015
Thursday, December 3, 2015
East End Crossing: Blasting schedule for week of Dec. 7
Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, East End Crossing: Blasting schedule for week of Dec. 7 www.kyinbridges.com
http://ift.tt/19fNRe4 December 03, 2015 at 07:02PM
http://ift.tt/19fNRe4 December 03, 2015 at 07:02PM
Kentucky: Blasting schedule for week of December 7, 2015
December 3, 2015 – Surface blasting is scheduled to occur near the intersection of U.S. 42 and KY 841 during the week of December 7, 2015. Prior to each blast, traffic must be stopped for five to twenty minutes for the safety of the workers and the traveling public. Traffic will be stopped on KY […]
via East End Crossing http://ift.tt/1IGZLhu http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1IGZLhu http://ift.tt/eA8V8J
Indiana: Lane restrictions on SR 62 December 7-12, 2015
December 3, 2015 – There will be lane restrictions on SR 62 and its corresponding ramps in the vicinity of the SR 265/ SR 62/ Port Road interchange December 7-12, 2015 from 8 a.m.– 5 p.m. each day. The lane restrictions will be in place for about a half mile in each direction of the […]
via East End Crossing http://ift.tt/1IGZLhn http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1IGZLhn http://ift.tt/eA8V8J
Indiana: Lane restrictions on Upper River Road December 7-12, 2015
December 3, 2015 – There will be lane restrictions in Indiana on Upper River Road in the vicinity of the East End Crossing construction site December 7-12, 2015 from 8 a.m.– 5 p.m. each day. Flaggers will be present during this time to assist in guiding traffic. Motorists are asked to use caution when in […]
via East End Crossing http://ift.tt/1QXbTD0 http://ift.tt/eA8V8J
via East End Crossing http://ift.tt/1QXbTD0 http://ift.tt/eA8V8J
Subscribe to:
Posts (Atom)