Tuesday, November 3, 2015

Kentucky: Blasting schedule for week of November 2, 2015

October 29, 2015 – Surface blasting is scheduled to occur near the intersection of U.S. 42 and KY 841 during the week of November 2, 2015. Prior to each blast, traffic must be stopped for five to twenty minutes for the safety of the workers and the traveling public. Traffic will be stopped on KY […]

via East End Crossing http://ift.tt/1MvGikl http://ift.tt/eA8V8J

Louisville Weather Forecast; November 03, 2015 at 05:00AM

Morning Weather Forecast: Fair with a temp of 47F.

Todays forecast calls for 77F and a low of 56F.

UV Index: 0

Humdity: 90

Pollen Count: 1.50

img src="http://ift.tt/1hh3vdj">

Monday, November 2, 2015

Bridge to open to two-way traffic in December

Workers are in the home stretch Nov. 2, 2015 – Workers on the new Downtown bridge, the centerpiece of the Downtown Crossing portion of the Ohio River Bridges Project, are putting the finishing touches on the new bridge. It’s expected to open to two-way traffic in December. The final steel beam for the deck of the new […]

via Ohio Bridges http://ift.tt/1RKLjtD http://ift.tt/eA8V8J

Downtown Crossing: Bridge to open to two-way traffic in December


Louisville Kentucky'a New East End Bridge via www.kyinbridges.com, Downtown Crossing: Bridge to open to two-way traffic in December www.kyinbridges.com

http://ift.tt/19fNRe4 November 02, 2015 at 01:08PM

Louisville Weather Forecast; November 02, 2015 at 05:00AM

Morning Weather Forecast: Fair with a temp of 46F.

Todays forecast calls for 74F and a low of 48F.

UV Index: 0

Humdity: 96

Pollen Count: .80

img src="http://ift.tt/1hh3vdj">