July 30, 2015 – The Ohio River Bridges Project has produced a series of four videos, each approximately two minutes long, detailing construction of the various portions of the East End Crossing: The Indiana approach The bridge The Kentucky approach The tunnel The hi-def videos provide additional information and never-before-seen views of the project’s construction, […]
via East End Crossing http://ift.tt/1h8gdQw http://ift.tt/eA8V8J
Thursday, July 30, 2015
Louisville Traffic Update, Disabled Vehicle-Occupied. Right Lane Blocked. : May be viewed on TRIMARC camera 0333.
53572 : I-65 South at MM 136.8 Disabled Vehicle-Occupied. Right Lane Blocked. : May be viewed on TRIMARC camera 0333. July 30, 2015 at 02:37PM TRIMARC Incident and Construction Feed
Louisville Traffic Update, Disabled Vehicle-Occupied. Left Shoulder and Left Lane Blocked. : May be viewed on TRIMARC camera 16.
53568 : I-264 West at MM 0.2 Ramp to Sherman Minton Bridge Disabled Vehicle-Occupied. Left Shoulder and Left Lane Blocked. : May be viewed on TRIMARC camera 16. July 30, 2015 at 01:38PM TRIMARC Incident and Construction Feed
Louisville Traffic Update, Disabled Vehicle-Occupied. Left Shoulder Blocked. : May be viewed on TRIMARC camera 75.
53569 : I-264 East at MM 16 Area of Bardstown Rd Disabled Vehicle-Occupied. Left Shoulder Blocked. : May be viewed on TRIMARC camera 75. July 30, 2015 at 01:38PM TRIMARC Incident and Construction Feed
Louisville Traffic Update, Disabled Vehicle-Occupied. :
53566 : I-264 East Ramp to I-71 North Disabled Vehicle-Occupied. : July 30, 2015 at 12:09PM TRIMARC Incident and Construction Feed
Subscribe to:
Posts (Atom)